Time is money. Uptime makes money, and downtime
costs money.
TMI's industrial process team understands that dollars
are at stake with any shutdown. And even a carefully coordinated, preapproved
shutdown has to be swift and efficient.
The experts at TMI know this and work closely with you
on your design and installation requirements, making sure the solutions
are appropriate and efficient. They prepare in advance and are ready
to adapt to conditions as they arise in the field.
Whether a new system or retrofit, TMI handles small jobs
or complete turnkey projects - including:
- Compressed air systems
- Chilled water and tower water systems
- Silos and material conveying systems
- Material filtration systems
- Water filtration systems
TMI's recent industrial process
projects:

Plastech,
Chicago
In just three months, TMI delivered a total solution including the
material handing system, process cooling system, and electrical and
controls conduit at the new 200,000 square foot Plastech facility on
Chicago's South Side. At this plant, which exclusively supplies
injection molded parts for Ford, TMI installed six 36-foot storage silos
and more than 10,000 feet of material conveying piping, both stainless
steel and aluminum, to move the abrasive and non-abrasive polypropylene
pellets to 28 injection mold machines. From two 250-ton cooling towers,
TMI installed process cooling water piping to each machine. In addition,
TMI handled the installation of the data cabling for the facility's
control systems. All the work was done on a fast-track schedule to
ensure Plastech would swiftly be up and running in sequence with Ford.
Acme Packaging, Riverdale, Ill.
Rather than continue to lose hundreds of thousands of dollars every
year as unrecovered wastewater, Acme Packaging turned to TMI for a closed-loop
central chilled water system. No longer does city water cool the equipment
at this manufacturer of plastic banding then drain away. Instead, a
closed system pumps captive water from a 100-ton chiller to the manufacturing
equipment, then back to the tank for recooling. TMI installed the system
with minimal downtime for Acme.
Kamco Plastics, Schaumburg, Ill.
For long-term client Kamco (10+years), TMI performs regular ongoing
installation and maintenance. Recently TMI installed a central chiller
system in one of the company's two side-by-side injection-molding plants.
Realizing it could no longer simply buy material and store it in big
cardboard boxes on site, Kamco also commissioned TMI with installing
a material conveying system, one that includes a separate silo to store
the plastic pellets and feed both plants.
Parker Plastics, Pleasant Prairie, Wis.
A regular TMI client, Parker Plastics manufactures plastic bottles such
as bear-shaped honey containers and squeezable mustard jars. TMI installed
a chilled water system and material conveying system as well as a high/low
compressed air system that Parker utilizes in the blowmolding production
of its bottles. With a 24-7 production schedule, Parker appreciates
TMI's speed and expertise and 24-hour maintenance availability.
Copyright
© 1997 - 2008 Team Mechanical, Inc. All rights reserved.
431 Lexington Dr, Buffalo Grove, IL 60089